The
primary control interface is linked to the physical
field equipment (CCRs, circuit selectors and floodlights
etc) through either dedicated multi-core cables
or a fully managed, dual redundant fibre-optic
loop. A separate system provides detailed engineering
and maintenance monitoring data for engineering
users and can also be used as an emergency control
system. |